SASERÁ Academy
Google Cloud DevOps Engineer · SRE cheat sheet

SRE SLO and error budget cheat sheet: the math, worked out

Site reliability engineering is about 18% of the DevOps Engineer exam, and burn-rate questions make plenty of experienced engineers second-guess themselves under a timer. You do not need advanced math, only a few formulas you can trust. Here they are, with the numbers already worked out. The definitions follow Google's SRE books and Cloud Monitoring documentation, read on October 28, 2026; the worked numbers are our own arithmetic.

1 - SLOerror budget
43.2 min99.9% over 30 days
> 1burn rate = trouble
~18%SRE section
Google Cloud Professional Cloud DevOps Engineer practice exams course cover

SLI, SLO, SLA

TermWhat it isRemember
SLIThe measurement: good events over valid eventsRequest-based counts requests; windows-based counts good time windows
SLOYour internal target for the SLI over a compliance periodPeriod is rolling (for example 30 days) or calendar (for example a week)
SLAA contract with consequences if missedSet the SLO stricter than the SLA, so you react before the contract is breached
Error budget1 - SLO: the unreliability you are allowedSpend it on releases and experiments; protect it when it runs low

Error budget in minutes (30-day period)

30 days = 43,200 minutes. Budget minutes = 43,200 x (1 - SLO). Useful when a question counts downtime instead of failed requests.

SLOError budgetFull downtime allowed in 30 days
99%1%432 minutes (7.2 hours)
99.5%0.5%216 minutes (3.6 hours)
99.9%0.1%43.2 minutes
99.95%0.05%21.6 minutes
99.99%0.01%4.32 minutes

Each extra nine cuts the budget by ten. That is why Google's SRE guidance weighs the cost of each nine against what users actually notice.

Burn rate, worked out

Burn rate = observed error rate / error budget rate. Time to exhaust a full budget = period / burn rate. Example SLO: 99.9% over 30 days, so the budget rate is 0.1%.

Error rate (constant)Burn rateFull budget gone in
0.1%130 days (the whole period)
0.2%215 days
0.4%47.5 days
1%103 days
10%1007.2 hours
Read the question twice: a burn rate above 1 means the budget runs out before the period ends. Cloud Monitoring can alert on it with the select_slo_burn_rate selector, and Google's SRE workbook recommends combining a fast window and a slow window so you catch sharp outages and slow leaks without paging on every blip.
Practice with 10 free questions: 10 free DevOps Engineer questions. Every option is explained, right or wrong. One of them is a burn-rate calculation.

Beyond the math

Error budget policy: agree in advance what happens when the budget is spent, such as freezing releases except reliability fixes. The policy turns the number into a decision.

Incidents: an incident commander, clear roles and a blameless postmortem afterwards. Mitigate first (roll back, shift traffic to the previous revision, add capacity), find the root cause second.

Service mesh SLOs: Cloud Service Mesh can define SLOs on mesh metrics such as availability and latency, which the current guide names in its SRE section.

Burn-rate questions make you nervous? You are in good company

Even engineers who run on-call rotations hesitate on these under a timer, because the numbers look bigger than they are. Three habits make them routine.

1

Write the budget first

Before reading the options, write 1 - SLO. Every other number in the question is compared with it.

2

Divide, do not guess

Error rate divided by budget rate gives the burn rate. Period divided by burn rate gives the time left.

3

Mitigate before you debug

If users are affected now, the right answer usually restores service first, often by moving traffic back, and investigates after.

Try a burn-rate question for real

Ten free DevOps Engineer questions, no sign-up, every option explained.

Try 10 free questions first →

Six timed DevOps Engineer practice exams, 360 questions

10-11 SRE questions in every exam, with SLOs, burn rate, rollbacks and capacity, every option explained.

See the DevOps Engineer course →

SRE SLO and error budget FAQ

What is the difference between an SLI, an SLO and an SLA?

An SLI is the measurement (for example, the share of good requests). An SLO is the internal target for that measurement over a period. An SLA is a contractual commitment with consequences, and the internal SLO is set stricter than the SLA.

How do I calculate an error budget?

Error budget = 1 - SLO. For 99.9% over 30 days, the budget is 0.1% of requests, or about 43.2 minutes if you count time.

What does a burn rate of 1 mean?

You are spending the error budget exactly as fast as the period allows: it runs out at the end of the period. Above 1, it runs out early; below 1, some budget is left.

Why not aim for 100% availability?

Each extra nine costs more and slows delivery, and users rarely notice the difference past a point. Google's SRE guidance treats 100% as the wrong target.

What happens when the error budget runs out?

A common error budget policy freezes releases except reliability fixes until the service is back within its SLO.

Request-based or windows-based SLI?

A request-based SLI counts good requests against all requests; a windows-based SLI counts good time windows against all windows.

More guides: Free Google Cloud DevOps Engineer questions · Check this before you book the DevOps Engineer exam · DevOps Engineer exam guide changes · Free Google Cloud ACE questions · all guides

SERÁ Academy is not affiliated with, endorsed by, or sponsored by Google. Google Cloud and related product names are trademarks of Google LLC. PagerDuty and other third-party names belong to their owners.